Electrical Design

We prepare application projects for LV and MV electrical installations together with calculation reports and follow the approval process (distribution company, organised industrial zone, TEDAŞ). Short-circuit, voltage drop, cable sizing and protection calculations are carried out in ETAP and to TS HD 60364.

Unit of measurement
kA
Measurement and tools
ETAP · lux meter
Basis
Electrical Installations Project Regulation
Service area
Based in Ayvalık, Aegean Region

Scope

  • Internal installations: lighting, socket outlet and power installation projects.
  • Distribution: LV distribution and board projects, compensation projects.
  • MV: transformer substation and overhead line projects; connection projects for industrial facilities and organised industrial zone plots.
  • Earthing and lightning protection: projects to TS EN 50522 and TS EN 62305.
  • Calculations: short circuit (IEC 60909), voltage drop, cable sizing (TS HD 60364-5-52), protection selectivity, lighting (TS EN 12464-1).

Method and instruments

Every calculation is shown in the report with its inputs and assumptions; short-circuit and selectivity studies are carried out in ETAP.

For projects in existing facilities, load data is verified on site: hourly OSOS data or a Kyoritsu KEW 6315 measurement, and surveys of existing boards and cables.

Lighting calculations can be verified after installation with lux meter measurements.

Regulations and standards

  • Electrical Installations Project RegulationPreparation and approval of projects
  • Regulation on Internal Electrical InstallationsRules for internal installations
  • Regulation on Heavy Current Electrical InstallationsMV installations
  • Regulation on Earthing in Electrical InstallationsEarthing systems
  • TS HD 60364Low-voltage electrical installations
  • TS EN 12464-1Lighting of indoor work places
  • IEC 60909Calculation of short-circuit currents

Deliverables

  • Project set ready for approval: drawings, single-line diagrams, calculation reports, bill of materials
  • Follow-up of the approval process and revisions
  • Answers to project questions during installation; post-installation check measurements on request

Frequently asked questions

How long does project approval take?

It depends on the approving body (distribution company, organised industrial zone, TEDAŞ) and its workload. We shorten the process by submitting complete projects and responding quickly to revision requests.

What information is needed for a project?

Architectural plans (DWG), installed power and load list, the distribution company's connection opinion, the intended use of the facility and, for existing facilities, OSOS or measurement data.

Why does the short-circuit calculation matter?

The breaking capacity of circuit breakers and fuses must exceed the maximum short-circuit current (kA), while the minimum short-circuit current determines whether protection disconnects fast enough. Both values are given in the calculation report.

Request a quote for this service

Fill in the form and we will get back to you within one business day. You can also reach us by phone or e-mail.

Related services

kVA

MV / LV Installations

Transformer substation, switchgear and panel design; busbar and earthing installations, protection relay commissioning, testing and reporting.

Design · commissioningGet a quote
cosφ

Power Quality & Compensation

Design and installation of reactive power compensation systems, reactive power monitoring, harmonic filter systems for equipment protection.